Grand Cache RCMP Detachment

Corrections

Construction Delivery Method: Design-Bid Build

Class D Schematic Design Costing: $4,232,500
Tender Award Price: $4,676,200
Final Contract Price: $4,798,977

Completion Date: 2014

Intent of the project was to provide a permanent and adequate space for the RCMP to function and provide services within the growing town and instill a consistent presence of the local image of the community.

  • The facility was built with the intention of low maintenance due to the remote locations.
  • The new building was built with best practice methods utilizing LEED standards such as
    specifying local, sustainable materials or seeking energy efficient solutions that wouldn’t require
    regular maintenance/ specialized parts or specialist to operate efficiently.
Grande Cache 2
Grand Cache RCMP Detachment

We do projects with, not for communities. Find out how together we create places for all of the people they serve.