U of S Gordon Oakes Red Bear

Education

Gordon Oakes Red Bear Interior Lighting scaled.

RBM + Douglas Cardinal

Architect | New Construction

Size: 1,946 sqm (20,947 sq.ft)

Construction Delivery Method: Design-Bid-Build

Budget: $12,500,000

Construction Cost: $13,400,000

Completion Date: 2017

Awards:

  • Premier’s Award of Excellence in Design, 2017
  • Masonry Institute President’s Medal, 2017

Perhaps the most important recent project RBM Architecture has undertaken, for the purposes of providing a project that best profiles our firm’s capabilities and the way we work as a team on our projects with all Stakeholders, was for the University of Saskatchewan – the new Gordon Oakes Red Bear Student Centre. Working in association with Douglas Cardinal Architect of Ottawa, an Integrated Design Process was incorporated to listen to the elders and produce a living building that is home for Aboriginal students on campus. It is a community centered, public space.

The building has been named after Gordon Oakes (Red Bear) (1932- 2002), a former Chief of the Nekaneet First Nation, who was committed to education and known for his instrumental work during the Treaty Land Entitlement Process.

The 1946 m2 Student Centre houses the Indigenous Students Council and the Aboriginal Students Centre, with space for studies and ceremonies. It connects via underground tunnels to the Arts Building and Murray Library, and to the newly renovated Health Sciences.


Gordon Oakes Red Bear Exterior Night scaled.

The planning of the building is based on teachings that the circle is the symbolic base for healing, knowledge and equality: the foundation for all Indigenous ceremonies. The Central Gathering Space is both the symbolic and systemic base for the building’s plan, with its centre based on the earth and with a view to the sky above. The building integrates sculptural qualities with sustainable solutions for the building envelope, mechanical systems, passive solar gain, material selections, and energy and water management strategies.

The building was designed in accordance with LEED strategies for consumption, local materials, and with many more features that come together in an elegant, seamless integrated design.


Key Staff

Paul Blaser, Project Lead, Contract Admin

Lilia Buza, Project Architect

Wendel Heron, Senior Technologist


We do projects with, not for communities. Find out how together we create places for all of the people they serve.